A Study on Cyclone Aila Recovery in Koyra,Bangladesh:Evaluating the Inclusiveness of Recovery with Respect to Predisaster Vulnerability Reduction

更新时间:2016-07-05

1 Introduction

Bangladesh is geographically located in a cyclone-prone area,and has a long history of being hit by cyclones(Akhand 2003).Historically,cyclone risk reduction initiatives in Bangladesh have focused on saving lives(Haque et al.2012).Prompted by the deadly Bhola cyclone in 1970 soon after Bangladesh’s independence,the new government launched a cyclone preparedness program,which established a vast network of volunteers for risk communication and evacuation management in 1972.After a cyclone in 1985,the government constructed multipurpose cyclone shelters across the coastal areas(Shah Alam Khan 2008).Coastal embankments were constructed to prevent the high tides often associated with cyclones,which had the additional benefit of also effectively preventing damage from low-intensity storm surges(Shah Alam Khan 2008).After yet another devastating cyclone in 1991,these initiatives were further strengthened,along with coastal afforestation,the creation of a preparedness policy,and enhanced disaster awareness.Since these initiatives have successfully reduced the loss of lives in several cyclone events,Bangladesh has been praised internationally as a pioneer in disaster preparedness(Haque et al.2012).This success story and the presence of the coastal embankment created a false sense of security within Bangladeshi society,an overconfidence reflected in evacuation behavior during recent cyclones(Paul and Dutt 2010;Saha and James 2016).

Despite an extensive history of cyclone activity,many sources of vulnerability to cyclone disaster still exist.Poverty,settlement in low-lying coastal areas,inadequate availability of cyclone shelters,and overdependence on traditional livelihood are still considered major sources of vulnerabilities(Alam and Collins 2010;Mallick et al.2017).After two recent cyclones(Sidr in 2007 and Aila in 2009),researchers were attracted to issues of disaster recovery.Several studies have been conducted on recovery needs(Mallick et al.2011),changes of income after recovery(Abdullah et al.2016),individual recovery strategy(Parvin and Shaw 2013),housing recovery initiatives(Mallick and Islam 2014),and resilience building(Ahmed et al.2016).Whether the post-disaster recovery initiatives have eliminated the root causes of vulnerabilities is still underinvestigated.In-depth research on recovery from the perspective of vulnerability reduction is still needed,which has prompted this research effort to examine the recovery from cyclone Aila in Bangladesh.

Cyclone Aila,which induced a storm surge that varied from two to four meters high(IFNet 2009;Mallick et al.2011),struck the southwest coast of Bangladesh on 25 May 2009.It was a severe cyclone with an intensity(Fig.1)similar to a Category 1 cyclone as per the Saffir-Simpson scale(Sadik et al.2017).The cyclone affected 3.9 million people,and caused 190 deaths(UNDP 2010).The coastal defense structure and road communication system in the affected area collapsed,as 237 km of embankment,2233 km of roads,175 bridges,and multiple culverts were seriously damaged or destroyed(UNDP 2010).Post-storm damage assessment revealed huge economic loss,prolonged suspension of livelihood activities,and long-term suffering related to deplorable housing,food,sanitation,and drinking water conditions in the affected areas(Tada 2011;UNDP 2010;Mallick et al.2011).Koyra,a coastal upazila(similar to a subdistrict),was one of the areas most severely affected by the cyclone(UNDP 2010).

The government and humanitarian organizations responded quickly with emergency support(UNDP 2010).Later,the government appealed for international assistance with recovery and reconstruction(Tada 2011).In response,different bilateral and multidonor organizations assisted with recovery support projects for housing,livelihood stabilization,sanitation,and coastal embankment and other infrastructure rebuilding(UNDP et al.2013;EKN and UNDP 2015).Although a few innovative approaches emerged from different studies,such as the disaster resilient habitat promoted by Mallick and Islam(2014)and an attempt to build community resilience through integrated water management(EKN and UNDP 2015),these initiatives were not widely implemented.Community suffering due to continued tidal flooding,income insecurity,lack of freshwater supply,and vulnerabilities due to weak coastal embankments was still visible 7 years after the cyclone(Hossen 2016;New Age 2016).This persistent situation justifies research into whether the recovery process paid attention to pre-Aila vulnerability reduction(PAVR)as part of its mission.

2 Study Area

Our research considered Koyra Upazila(Fig.1)as the case study site because the area was severely damaged by Cyclone Aila.But the general mechanism of planning and implementing government and aid-assisted recovery projects is similar in other parts of the country,as all plans and projects are formulated at the headquarters of relevant government departments and NGOs based in Dhaka.

Koyra is a coastal upazila of the Khulna District.The upazila is located at the border of the Sundarbans mangrove forest and about 100 km by road from Khulna City(Fig.1).When the cyclone struck,the entire upazila was inundated because of overtopping and breaching at 34 separate places of the coastal embankments(Roy et al.2009).The cyclone affected a population of 152,496 in Koyra(Koyra Upazila Nirbahi Officer’s Office 2010).Aila damaged 81 km of embankments(between polder 13–14/2 and 14/1),680 km of earthen road,163.5 km of asphalt road,49 bridge culverts,42,440 houses,nine academic institutions,192 religious institutions,the crops on 11,500 hectares,and 10,364 fish aquaculture farms in the upazila(Koyra Upazila Nirbahi Officer’s Office 2010).Thereafter,the government and its development partners considered Koyra Upazila a priority area for recovery and reconstruction.

3 Methodology

New groups of local volunteers,better community-NGO partnerships,and expanded community training might improve social networks,but institutionalization of these networks still needs to be resolved(Islam and Walkerden 2017).Similar to the social network expansion,building more links and bridges between social capital centers is also important(Nakagawa and Shaw 2004).During Aila recovery,links and bridges between local communities and local administrations,local government institutions,academic societies,science and technological societies,and neighboring communities were overlooked.These concerns in fluenced the experts to give a moderate score for the contribution of network improvement to PAVR.

Fig.1 Map of the study area,Koyra Upazila(subdistrict),Khulna District,Bangladesh

3.1 Developing the Overall Storyline

The recovery storyline of Aila was developed from the literature review and data collected from the institutional surveys,FGD,and KII.

双向调节蛋白、转录因子E2启动子结合因子1、白细胞介素6的表达与结直肠癌发生发展的相关性 ………… 陈艳昕 刘庆滨 黄江梅 等(3)316

Institutions,especially local NGOs involved in recovery and reconstruction in Koyra,were identified using a snowball sampling technique(Goodman 1961).Since the list of NGOs involved in Aila recovery and their activities were not well-documented and archived in any single place(for example,local government Offices),we adopted the snowball technique as described in Fig.2.

Additionally,local representatives of the Department of Disaster Management,the Bangladesh Water Development Board (BWDB),the local Government Engineering Department,the deputy team leader of the Coastal Embankment Improvement Project(CEIP),and the director general of the Water Resources Planning Organization were interviewed as key informants.

3.1.2 Focus Group Discussion

To comprehend the overall storyline of the recovery,FGDs consisting of local people were conducted at 14 villages(Fig.1).Although FGDs were conducted informally,interviewers followed structured questionnaires and compiled notes on discussion issues.The average number of participants in the 14 FGDs was 10(maximum 13 and minimum seven),with one-third of participants being female(except at three locations where participants were only male).The three males-only FGDs were conducted at rural growth centers(market places)with mostly local traders and shoppers where women are rarely found.

Before conducting the FGDs,a questionnaire survey was carried out in five unions(the smallest administrative units in rural area of Bangladesh).A total of 150 household heads were interviewed(Fig.1).Although the quantitativedata of the survey is currently being analyzed and results are not available,the collective understanding of and information obtained through this survey helped in the planning and implementation of the FGDs.

Fig.2 Process of institutional surveys and expert interviews

3.2 Diagnostic Analysis of Recovery

2)每一个数据层都有一个特定的标识名,如地形-T1、建筑-M2、路标数据-S3、规划数据-P4等。同时,每一种数据都有一个表示该类数据的名称,如地块-Ground。数据按照文件夹目录结构组织,如图1所示:

3.2.1 Analysis of PAV and Selection of Indicators for Diagnostic Analysis

“综合材料艺术”的概念,最为直接的理解就是视觉艺术中混合运用多种材料进行艺术创作。综合材料的英文名称是Mixed media & material,又可以称为复合材料或综合媒介,强调材料多元、复合、兼容的特点。综合材料不一定是现成品,可以是制作作品的特殊材料。综合材料的“综合”二字,还有一个针对性,就是指不只是用单一、惯用的艺术材料,比如蛋清颜料、油质颜料或水墨等等,而是自由采用那些在既往艺术创作中不用或较少使用的多种生活材料、工业材料。综合材料在更多的时候体现为艺术创作的新的形式语言,而语言的变化往往使得

Understanding Koyra’s PAV followed the pressure and release(PAR)model approach(Wisner et al.2004)and was the first step of our diagnostic analysis.The theoretical assumptions of the frequently-cited PAR model(Wisner et al.2004)define vulnerability as a product of unsafe conditions that originate from a problem’s root causes.In addition,the Access model of vulnerability(Wisner et al.2004)implies that if the root causes and resultant pressures are not resolved through recovery,the unsafe condition will continue.Chhotray and Few’s(2012)case study of the recovery from Cyclone Orissa supports the PAR theory.Field observation and news reports regarding ongoing human suffering in Koyra Upazila identified repeated embankment failure,erosion,and inundation(Hossen 2016;New Age 2016;The Independent 2016)as major problems and convinced us to examine the Aila recovery from a context of vulnerability reduction as described by the PAR model.The root causes of pre-Aila vulnerabilities were identified by a review of relevant existing studies,and were validated by the FGDs.Amodified PAR model for a Bangladesh cyclone case(Awal 2015),the Disaster Crunch Model,was developed through a systematic analysis of post-Aila conditions(Saha 2015)and NGO assessments regarding Aila’s damage and local community needs(ECHO 2009;Roy et al.2009).There was a great amount of help available in identifying PAVs and their nature and dynamics.Several case studies(Mallick et al.2011;Mallick and Vogt 2014;Islam and Walkerden 2015;Abdullah et al.2016)helped to identify the root causes of vulnerabilities,dynamic pressures,and possible reduction measures.FGDs with local people helped validate the root causes of endemic problems,clarified the overall PAV context,and finalized indicators of PAVR measures.The process of understanding PAV ultimately helped with the selection of a set of indicators for the diagnostic analysis of the ongoing recovery regarding PAVR.

3.2.2 Calculating the Degree of Inclusion of PAVR in Recovery

Fig.3 The diagnostic analysis process to examine inclusion of PAVR in Cyclone Aila recovery

A simple screening method of assessing recovery(Contreras 2016)was modified by combining expert judgment and a scoring approach(Gain et al.2015;Giupponi et al.2015).Details of the scoring and computation are displayed in Fig.3 and Table 1.As illustrated in Fig.3,the scoring technique included three processes:(1)a primary screening of recovery initiatives;(2)an expert evaluation;and(3)calculation of the degree of inclusion of PAVR measures in recovery.The first step was started by cross-checking and reviewing the relevant reports of Aila response projects(ECHO 2009;Roy et al.2009;Walton-Ellery 2009;IFRC 2010),project documents of different donors(IOM 2010;EKN and UNDP 2015),relevant reviews(Tada 2011;JICA and OCCL 2012;Abdullah et al.2016),project documents of UNDP early recovery facilities(UNDP 2011;UNDP et al.2013),and unpublished documents collected from local NGOs.Findings of this preliminary scoring were cross-checked by interviewing representatives of different institutions as illustrated in Fig.2.In the second step,the evaluation of identified recovery initiatives was done by expert judgment.Experts were asked to provide scores within the range of 0(no contribution)to 5(significant contribution),which were then normalized using the min–max method(OECD 2008).The process of expert selection is presented in Fig.2b.Finally,the score representing the degree of inclusion was calculated for each indicator.The 0–5 scores represent measurements of inclusion of an indicator within the recovery process.Since all the indicators were grouped into five criteria,an average was also calculated for each criterion,representing the degree of inclusion of the PAVR criterion in recovery.

4 Storyline of Aila Recovery at Koyra

The storyline can be simply described with a matrix(Table 2),which presents a list of recovery activities along with implementing agencies.The matrix highlights the involvement of a large number of nongovernmental organizations(NGOs)along with relevant government organizations(GOs)in Koyra’s recovery.The table suggests acoordination structure at a local level that was not perfectly functional at the time recovery activities were implemented in post-Aila Koyra(Sadik,Nakagawa,Rahman et al.2017).

Table 1 A sample table showing details of scoring and calculating inclusivity of PAVR indicators

aIf the indicator is not included/covered by any recovery initiative,then the score=0,meaning non-inclusion of the indicator.If it is included,then the score was decided by further expert evaluation and judgment and marked as “Further Evaluation(FE)” bThe list of initiatives inclusive of the indicator cMean of scores given by five experts,who were asked to evaluate the potential impact of the action/initiative on PAVR.Experts evaluated the action/initiative by giving a score between “0”and “5”.“0”=no contribution to PAVR,1=the least contribution,and 5=significant contribution dNormalization of the score using min–max method(OECD 2008) eArithmetic average of calculated scores in column 6 for each indicator fColumn 3 multiplied by column 7 gMean of scores in column 8 under each criterion

I II III 1.Criterion 2.PAVR indicators 3.Primary screeninga 4.Implemented actions/measures related to the indicatorb 5.Experts’judgment on impact on PAVR(0–5 scale)c Water,sanitation,and hygiene(WASH)and health Introduce appropriate water supply technology FEa Re-excavation/construction of ponds 6.Normalization of expert judgmentd 7.Average of scores of relevant measurese 8.Degree of inclusion of the indicator in recoveryf 9.Degree of inclusion of the PAVR criteria in recoveryg 2.8 0.56 0.58 0.58 0.43 Installation of deep tube wells/RHS 3 WASH and health promotion FEa WASH and health promotional activities 0.60 3.6 0.72 0.72 0.72 Capacity building of health institutions for disaster response 0 NA 0

The matrix depicts the sectors that different NGOs preferred,and which sectors were ignored.A large number of NGOs were involved in emergency relief operations,livelihood support,sanitation,and emergency repair of infrastructure;fewer were involved in the health,cyclone shelter,safety,and rehabilitation sectors.In general,NGO activity was limited to short-term measures,whereas GOs were involved in both long-term and short-term measures.All the recovery initiatives can be divided into four major work groups:humanitarian aid-driven emergency response,emergency repair of critical infrastructures,humanitarian aid-driven recovery,and government-led emergency recovery and rehabilitation.

4.1 Humanitarian Aid-Driven Emergency Response

The government,as well as international communities,responded immediately to the cyclone damage through provision of humanitarian assistance(Table 2).The government primarily provided cash grants,rice,and food assistance (through programs for vulnerable groups)(UNDP 2010;Tada 2011;Koyra Upazila Nirbahi Officer’s Office 2010).NGOs,with help from the international community,provided emergency material relief(food and nonfood items),emergency shelter and housing,emergency water supply and sanitation,cash grants(to compensate for work and training),and emergency health support(Table 2;Roy et al.2009;UNDP 2010;Tada 2011).Humanitarian aid-driven responses were commonly criticized for the lack of coordination among NGOs,overlapping activities,gaps in service areas,insensitivity to local needs,and corruption(Rahaman and Khan 2010;Mahmud and Prowse 2012).

木须:上周日,我下班回家的路上,不小心往一包子店里看了眼,居然发现做包子的师傅把掉在地上的面粉直接用小刷子扫起来,然后放在那个大大的塑料盆里了。

Table 2 The matrix of Cyclone Aila recovery activities in Koyra Upazila,Khulna District,Bangladesh.Source:Institutional Survey in 2016 and 2017

?

4.2 Emergency Repair of Critical Infrastructures

Several initiatives to repair rural infrastructure by engaging local people under “cash for work”or “food for work”schemes were initiated by the GOs and NGOs.But all such programs were short-term measures(Mallick and Islam 2014;Ashraf and Shaha 2016),and were not always successful due to the delay experienced in repair of damaged coastal polders(polder 13–14/2 and polder 14/1).The embankment’s repair was urgently needed by the local people as any delay hindered the implementation of other recovery initiatives(ECHO 2009).Weather conditions during monsoon season and the shortage of emergency funds exacerbated the delay and increased storm impact on agricultural output(Tada 2011).Due to constraints in the emergency budget,the completion of urgent repair work was limited in scope.In response to this,different NGOs offered their assistance to repair the embankments,but the BWDB could not allow this due to legal barriers,and concern for the NGOs’engineering capabilities.

4.3 Humanitarian Aid-Driven Recovery

The degree to which viable measures related to social capital are included in PAVR is low.Table 3 shows that two indicators were completely missing and three were only partially considered in the recovery process.Experts’judgment of the potential contribution made by implemented social measures to PAVR within recovery programs was at a moderate level.For example,due to the continuing uncertainty about the technological and financial capacities of the local volunteer organizations,experts considered the initiative of forming local volunteer groups to broadcast warnings and assist with emergency evacuations as a moderate contributor.Similarly,since the sustainability and continuation of disaster awareness by training programs and information campaigns were not assured,experts judged the initiative as a moderate PAVR contributor.

Although the UNDP-ERF,along with the LCG,acted as the national-level coordination structure,local(upazila)-level coordination was maintained by an UNO(Upazila Nirbahi Officer,the chief executive Officer of the local government).The coordination structure at upazila level suffered from a lack of resources(manpower, financial,and technical)and effective coordination and monitoring mechanisms(Sadik et al.2017).

4.4 Government-Led Emergency Recovery and Rehabilitation

Cyclone Aila hit the southwestern region at a time when the government was trying to rehabilitate the area after the damage caused by a previous cyclone(Sidr)that struck in 2007.To initiate the Cyclone Aila recovery,the government first attempted to include Aila recovery initiatives in the aid that supported Cyclone Sidr recovery projects.Later the government adopted specific plans for Aila recovery followed two approaches:(1)segmenting and prioritizing the reconstruction activities under the Annual Development Plan(ADP)of the government;and(2)formulating special projects(with foreign aid)for large-scale projects.For example,rural roads were reconstructed initially by modifying the Emergency 2007 Cyclone(Sidr)Recovery and Restoration Project(ECRRP)initiated by the World Bank(2013).Later the ADP and Rehabilitation of Aila-Affected Rural Infrastructure Project(RAARIP)were formulated to complete the unfinished rehabilitation tasks(Sadik,Nakagawa,Shaw et al.2017).A few coastal polders and allied structures were restored to predisaster design condition by modifying the World Bank-funded Water Management Improvement Project.The remaining polders were restored by the ADP and a project funded by EKN.Unfortunately,none of these projects considered the improvement and incorporation of new disaster risk reduction(DRR)measures.For the improvement of coastal polders,the BWDB initiated the Coastal Embankment Improvement Project(CEIP)in 2013,which includes one of Koyra’s polders(polder no 14-1).However,the physical work in Koyra has yet to start as the detail design is still in progress according to interviews with project officials in 2016 and 2017.Apparently,the overall recovery is very encouraging due to the joint approach of government and development partners,and a wide range of rehabilitation and development activity is soon to begin.But interviews indicate little evidence that recovery activities undertaken thus far have reduced the preexisting vulnerabilities of the community.

施工设计是关乎整个施工大局的环节,在施工设计中防渗漏设计尤为重要,如果设计不合理,施工材料质量再好,也无法避免渗水漏水问题,在施工设计中,有很多施工单位没有聘用专业的设计师或者设计师没有接受过专业性的技术指导,专业素质不过关,所以在进行设计时考虑不周到,导致防水设计在图纸上体现不周到,施工人员在施工时按照图纸上的粗略设计也进行粗略的施工,例如对窗户接缝处的防水设计经常会被设计师们忽略。或者是设计师在进行设计时,只注重美观而无法顾及防水设计,导致的结果都是防水施工不到位。

5 Analysis of PAV and Selection of Indicators for Diagnostic Analysis of Recovery

The PAVs have been classified into five major unsafe categories:(1)physical environment;(2)local economy and livelihood;(3)social relations and networks;(4)water,sanitation,and hygiene(WASH)and health;and(5)public actions and institutions for disaster preparedness(Fig.4).The success of recovery in DRR would largely depend on inclusion of appropriate measures to resolve unsafe conditions in these categories.Therefore,to examine Aila recovery,23 indicators were selected,which corresponded to necessary PAVR measures.The summary of the PAV assessment and the 23 selected indicators for recovery inclusive of PAVR are provided in Fig.4 and briefly discussed thereafter.

5 .1 PAV of Physical Environment and Relevant PAVR Measures

The poor structural condition of the coastal embankment was the most critical unsafe condition,responsible for 34 storm surge breaches within around 119 km of the embankment during Cyclone Aila(Roy et al.2009;Tada 2011;JICA and OCCL 2012).Poor maintenance of the embankments,illegal breaching by saltwater shrimp farmers,and river erosion had already weakened the structural condition of coastal and riverine barriers(Tada 2011).In the 1960s,coastal polders were constructed to promote rice cultivation.Later,due to attractive market of shrimp,rising salinity,and adverse impact of polders(for example,water logging)large farmers shifted from rice to shrimp farming.Shrimp farmers started either installing pipes or cutting the embankment to irrigate their shrimp aquaculture ponds by salinity rich river water.Thus,reduction of these root causes of the vulnerability is linked to the improvement of embankment structure with a new design,community agreement to shift from saltwater shrimp farming to rice cultivation,a comprehensive landuse plan for zoning of shrimp farming and settlements,and an improved maintenance plan and budget according to remarks obtained during FGDs and interviews with BWDB personnel.Poorly developed road networks and inadequate maintenance investment in transportation infrastructure were other major unsafe conditions of the physical environment pre-Aila that impeded emergency evacuation and response(Mallick et al.2011).Existing roads in poor condition were easily eroded by the storm surge.Cyclone Aila washed away 23,820 houses and partially damaged 18,620 houses(Koyra Upazila Office 2010),and finally forced around 42,000 people to migrate from Koyra(Islam and Hasan 2016).The weak house structures and scattered settlements along the river were unsafe conditions that resulted in housing-related vulnerabilities(Alam and Collins 2010).Traditional scattered settlements had grown without an integrated embankment system to protect them from the tidal flood,establishment of evacuation routes was deficient,and construction of cyclone shelters was inadequate to absorb refugees.The result was a population highly exposed to cyclone damage and storm surge(Mallick and Islam 2014).A land-use management practice that is inclusive of new settlement conception and construction,practices spatial planning,and prioritizes comprehensive land management is a key to vulnerability reduction(Mallick and Islam 2014).

5.2 PAV of Local Economy and Livelihood and Relevant PAVR Measures

The shrimp farming-and fishing-based livelihood system(with its high dependency on nature)was another PAV that resulted in a sudden drop in the local economic output due to the suspension of all agricultural-related activities in the post-Aila period(Abdullah et al.2016).The survey undertaken by Abdullah and his colleagues in 2016 showed that economic loss,income loss,and general suffering were highest for shrimp farmers,small businessmen,and agricultural farmers.Reduction of this livelihood-related vulnerability is linked with short-term measures(for example,relief,cash for work,and cash for training).More dependable and resilient vulnerability reduction must involve long-term measures that achieve diversification of the economy,improvement of structural safety,and technological improvement of agricultural activities,for example,by the introduction of saline-tolerant rice(ECHO 2009;Abdullah et al.2016).

● 通过以太网上的时间分片程序来保证带宽预留的协议。PROFINET®IRT是一个典型例子。IRT支持在背景流量的相同电缆上进行确定性硬实时数据传输。

Fig.4 Pre-Aila vulnerabilities and indicators of the recovery contributing to Pre-Aila Vulnerability Reduction(PAVR)measures

5.3 Social Relation and Network-Related PAV and Relevant PAVR Measures

Community-based organizations have limited capability to carry out emergency evacuation and response.This restricted ability is due to capital constraints,both financial and technical,and poor social networking(Islam and Walkerden 2015;Saha C.2015).Together these deficiencies ultimately weakened the ability of community organizations to respond to a regional disaster.In both coastal and riverine areas,community participation in water management was also very vague and suffered from inefficiency,inequality,and unsustainability(Dewan et al.2014;Gain et al.2017).Lacking meaningful local authority and control,most communities could not prevent illegal embankment breaching.Capacity development of social organizations and linking,bridging,and networking social capital(Nakagawa and Shaw 2004;Islam and Walkerden 2015)are keys to promoting and achieving PAVR.Capacity development of community-based organizations to ensure participation in water management is another key measure to realize PAVR.Meaningful involvement of local governments in and management responsibility for a permanent polder maintenance fund could institutionalize participatory coastal water management(Dewan et al.2014)and should be considered an important component in the recovery process.

5.4 Water,Sanitation,and Hygiene(WASH)and Health-Related PAV and Relevant PAVR Measures

Lack of appropriate fresh water supply technology for the saline coastal region,high dependency on pondwater,which was exposed to storm surge,and lack of sanitation awareness were the major pre-Aila unsafe conditions that resulted in long-term post-Aila suffering(Mallick et al.2011;Tada 2011).Access to health facilities and the capacity of health institutions were limited,which disrupted emergency health response and caused inadequate health support post-Aila(Mallick et al.2011;Tada 2011).Three viable measures are needed to achieve PAVR:(1)promote water,sanitation,and hygiene(WASH)and health;(2)build the capacity of health institutions to improve the medical response to disaster;and(3)introduce appropriate technology for an upgraded,protected postcyclone water supply.

莲心碱对佛波酯所致耳肿胀炎症模型小鼠的抗炎作用及机制研究 ………………………………………… 姚 茹等(17):2364

5.5 PAV of Disaster Preparedness and Relevant PAVR Measures

From the standpoint of disaster preparedness,the poor capacity of cyclone shelters to house evacuees,a conventional cyclone warning system that was no longer adequate,uncoordinated NGO relief efforts,and a lack of proactive disaster preparedness were major pre-Aila unsafe conditions that resulted in prolonged human suffering(Mallick et al.2011;Tada 2011).The people in the area affected by Aila did not follow evacuation orders because of a lack of trust in the warning system,ignorance,and the challenge of low capacity cyclone shelters with no space for livestock(Saha and James 2016).Clumsy humanitarian aid and NGO coordination mechanisms at the local level were additional vulnerability conditions that hindered an efficient disaster emergency response(Sadik,Nakagawa,Rahman et al.2017).A large number of NGOs started providing recovery support to the local people under the coordination structure of UNO Office.The approach of NGO coordination was only arranging monthly coordination meetings at UNO Office,which did not ensure effective coordination(Sadik,Nakagawa,Rahman et al.2017).With no additional resources for monitoring and coordinating humanitarian organizations involved in relief and recovery,it became a very difficult challenge for the UNO Office to ensure alignment of humanitarian support to local needs and national disaster management plans.

Diagnostic analysis is related to the performance of a system and includes an organized way of identifying problems and the causes of these difficulties(Edquist 2011).Our research examined the recovery from Aila to determine whether it was planned considering appropriate measures for pre-Aila vulnerability reduction(PAVR).To this end,pre-Aila vulnerabilities(PAV)with root causes were identified;this led to the selection of a set of PAVR indicators.A score-based approach was applied to measure the degree of inclusion of each indicator within recovery.

3.1.1 Institutional Survey and Key Informant Interview

6 Measuring Inclusion of PAVR within Aila Recovery in Koyra

The 23 indicators presented in Fig.4 constitute the departure point for this section.The diagnostic analysis discussed in Sect.3.2.2 was applied to measure the inclusion of PAVR in Aila recovery.A quantified score was calculated for each indicator to measure the degree of inclusion of each indicator and each criterion.These results are presented in Table 3.

Table 3 presents only the 23 indicators that represent viable PAVR measures.Of the 23 indicators,10 were excluded from integration into post-disaster recovery projects and plans,12 were partially included,and only one was completely included.The indicators were grouped under five criteria.A score measuring degree of inclusion is calculated for each indicator.The average score of the indicators under each criterion reflects the degree to which a particular aspect of PAVR is included in recovery activities.The details of the results are presented in the fivesubsections that follow,together with the necessary reasoning and justification for their importance in reducing future vulnerability.

BRRS是一种罕见的常染色体显性遗传综合征,主要症状为发育迟缓、色素沉着、斑点状阴茎和脂肪瘤。CS和BRRS的生殖系突变有一部分重叠,不同的CS相关突变主要位于5′外显子编码区,而BRRS突变主要发生在3′编码区C2结构域。PS主要由生殖系镶嵌突变引起,具有脂肪瘤、过度生长和良性肿瘤(错构瘤)特征。总之,PTEN突变会增加以上3种综合征的患病率,增加患者的患癌风险。

Table 3 Inclusion of PAVR measures in Aila recovery activities in Koyra Upazila,Khulna District,Bangladesh

Scores are numbers representing inclusion of indicator within recovery.Maximum number 1=completely included,minimum number 0=not included.Numbers in between 1 and 0 can be qualitatively described as:0.76–0.99=included to a large extent,0.51–0.75=moderate inclusion,0.26–0.50=poor inclusion,0.01–0.25=very poor inclusion

PAVR criteria Indicator of recovery initiatives inclusive of PAVR Degree of inclusion in Aila recovery Criteria average Physical environment Land-use planning 0 0.22 Improving structural strength of houses 0.58 Expanding road network with structural improvement 0 Structural improvement to critical installations(administrative installations,cyclone shelters,and so on)0.74 Rehabilitation of coastal embankments(improvement of design) 0 Measures for preventing illegal breaching of embankment 0 Local economy/livelihood activities Support for maintaining present livelihood 0.61 0.47 Support for livelihood diversification 0.56 Technological improvement of conventional agricultural activities 0 Livelihood safety for the marginalized groups 0.72 Social relations and networks Capacity building of volunteer organization for emergency response 0.68 0.41 Disaster awareness 0.69 Improving social network 0.67 Linking and bridging of social capital 0 Capacity development of community based organization in monitoring and preventing illegal breaching of embankment Water,sanitation,and hygiene(WASH)and health 0 Introducing appropriate water supply technology 0.58 0.43 WASH and health promotion 0.72 Capacity building of health institutions for disaster response 0 Disaster Preparedness(Public Action and Institutions)Construction of new cyclone shelter 1 0.47 Improving disaster governance 0.66 Improving early warning system 0 Improving mechanism for joint response and recovery mobilization 0.68 Improving harmonization of response and recovery at local level 0

6.1 Inclusion of Physical Environment-Related PAVR Measures

As we see in Table 3,creation of a land-use plan,increased road network,improvement of coastal embankments,and viable measures for preventing embankment breaching were completely missing in Aila recovery in Koyra.Eventually,the exclusion of four indicators and only the partial inclusion of two indicators made the degree of inclusion of the criteria,physical environment-related PAVR in the recovery,very low.

A hazard map-based land-use plan that would regulate the practice of saltwater shrimp farming inside the polder areas and the growth of scattered settlements in high risk areas is considered neither in practice nor in theory.Housing was a focus sector and the NGOs provided improved houses with a raised plinth level and measures for withstanding windstorms to many impacted families.These improved homes were provided to only 20–30%of the affected families and were planned without consulting local hazard maps or land-use plans(Sadik,Nakagawa,Rahman et al.2017).This seemingly random process led the experts that we consulted to give only a moderate score to the contribution of housing to PAVR.Although both GOs and NGOs reconstructed damaged roads(UNDP 2011;LGED 2016),no new roads have yet been constructed to expand the road network(according to information provided by the LGED Office Koyra),which was a major unsafe condition leading to vulnerability before Cyclone Aila(Mallick et al.2011).In all cases,typical design with no hazard mitigation improvement was followed.Field observation and FGDs indicate that the lack of DRR measures is evidenced by frequent road damage from heavy rain and tidal flooding.Several of the damaged administration buildings of the upazila were reconstituted specifically to take into account the need for additional DRR measures and improvements.For example,buildings were elevated on multistoried stilt-structures,constructed with reinforced cement concrete(RCC)foundations,and built on elevated sites,among other improvements.New cyclone shelters were also constructed in compliance with improved designs and new guidelines were recommended for the coastal area(UNDP et al.2013;LGED 2016).But only a small number of the shelters were constructed with associated livestock shelters,which discouraged experts from giving the maximum score possible during their evaluation.Coastal embankments were restored without improvement of their original design,and with neither maintenance mechanisms nor additional DRR.The only project that considered the improvement of the embankment is still in a study phase.Since no viable measures for preventing the illegal breaching of an embankment could be found in recovery initiatives,the relevant indicator was considered as missing.

(3)气候条件:贵州气候主要表现为年平均温度15摄氏度左右;日温差较大,年温差较小;雨水集中在夏秋两季,年平均降雨量为1100-1200mm,年蒸发量为1000-1200mm,与降雨量基本持平;冬季多间歇性细雨;云雾多,日照少;湿度年平均值在80%左右,相对较潮湿[7]。贵州属于典型的亚热带季风湿润气候,这种适宜的温度和降水量以及蒸发量和降雨的干湿季节交替明显,有利于溶蚀作用和红土化作用,有利于形成红粘土。

As discussed in Sect.5.2,increasing livelihood safety for marginalized populations by providing support for their present livelihood,encouraging livelihood diversification,and promoting technological improvement of conventional agricultural activities are keys to PAVR.Unfortunately,no initiative was found in recovery that addressed technological improvements to the conventional,unsustainable practices of shrimp farming and other agricultural activities.Since livelihood stability was a priority goal in the recovery process,the NGOs and GOs provided different support programs,including cash aid,cash for work and training,and training for alternative livelihoods to promote self-recovery(Walton-Ellery 2009;Tada 2011;JICA and OCCL 2012;Mahmud and Prowse 2012).These support actions were short-term measures,and the reduction of uncertainties and vulnerabilities embedded in these economic activities due to the cyclone disaster was not ensured by these support initiatives(Sadik,Nakagawa,Shaw et al.2017).With these facts very much in mind,experts judged the immediate post-disaster economic initiatives as moderate contributors to PAVR,and this in fluenced the moderate scores assigned to their degree of inclusion within recovery programs(Table 3).One indicator(technological improvement of agricultural practice)was missing;thus the final score for the inclusion of this cluster of initiatives—the reduction of local economy and livelihood activity related PAV—was lowered(Table 3).

6.2 Inclusion of Local Economy and Livelihood-Related PAVR Measures

不同高校在校园建筑设施上存在着较大的不同之处,因此,校园环境导视系统的建设十分重要。在高校校园环境导视系统设计中,必须以高校校园的教育需求为依据,将学校的各个功能区域包含其中。简单而言,就是将学校的学术性、精神文化等凸显出来。就目前校园导视系统的设计,主要包括:室外标识、室内导视系统、服务系统几部分。随着校园建设的加速,交通标识系统也是其中重要的一项,能够促使学生明确地识别人、车的行驶路线。[2]楼体导视标识,可以帮助学生更快地识别各个建筑物的名称,确保能够在较短的时间内找到自己要到达的地方。

6.3 Inclusion of Social Relation-Related PAVR Measures

Development partners and different NGOs worked together to promote recovery under a coordination mechanism—the Local Consultative Group,or LCG—jointly established by the government and the development partners.Following the cluster approach of aid coordination(IASC 2012),the LCG rolled out an early recovery cluster that led to the formation of a multidonor project entitled the Early Recovery Facility(ERF)led by UNDP.The LCG evolved into an umbrella body for enhanced financing and implementation of all aided recovery efforts(UNDP 2011).In Koyra,the major recovery efforts implemented by ERF included construction of new houses with sanitation facilities;support for education,health,and nutrition programs;support for the formulation of national disaster management plan(2010–2015)(DMB-MFDM 2010);and guidelines on emergency response procedures(UNDP 2011).Under the umbrella of ERF,the Embassy of the Kingdom of the Netherlands(EKN)formulated a project entitled“Improved Resilience of Coastal Communities through Rehabilitation of Coastal Embankments”(EKN and UNDP 2015).The reconstruction of a 2.92 km section of the embankment,installation of new drinking water sources(tube wells and ponds),cash grant support to certain households for alternative livelihood development,and tree planting were highlights of this project in Koyra.

This research involved two steps:(1)development of a recovery storyline;and(2)diagnostic analysis of the post disaster recovery.The overall research evolved through theoretical and subjective analysis supported by literature reviews and policy,stakeholder,and institutional analyses to support of the theoretical and subjective findings by institutional surveys,key informant interviews(KII),focus group discussions(FGD)with local people,and expert interviews.

To ensure community participation in water management,the BWDB plans to form several water management committees comprised of local people.Taking into account examples from other coastal areas of Bangladesh,these committees are often not effective in maintaining embankment fidelity due to political and financial challenges,as well as weak legitimacy(Gain and Schwab 2012;Dewan et al.2015).The capacity development of community-based organizations in monitoring and preventing illegal breaching of embankments is also a missing link.

随着数字影像技术的发展,数字化技术使得长期以来深藏于寺庙、博物馆、库房的西藏历代唐卡精品以全新形式向世人展示、传播[2]。在网络高速发展的时代,加之唐卡产业化发展趋势,数字化唐卡图像成为促进西藏文化传播、经济发展的重要途径之一。

6.4 Inclusion of WASH and Health-Related PAVR Measures

The GOs and NGOs installed hand-pump tube wells,reexcavated ponds,and installed pond sand filters(PSF)and household-level rainwater-harvesting systems(RHS)in different affected villages(Tada 2011;JICA and OCCL 2012;EKN and UNDP 2015).In a few villages,ponds and PSFs were not effective due to salinity intrusion from the nearby saltwater shrimp farms(Sadik,Nakagawa,Shaw et al.2017).Similarly,RHS suffered from maintenance issues and capacity limitation.Therefore,experts judged these promising initiatives as only moderate contributors to PAVR(Table 3).

In their promotion of WASH and health,NGOs and GOs have partnered to launch several nationwide campaigns.Sanitation was one of the priority issues in humanitarian aid.The housing units provided by NGOs for affected families were equipped with sanitation facilities.However,these facilities did not include DRR measures to ensure safety from a tidal flood.A number of campaign programs were only short-term and project-based,which reduced their impact.Experts therefore evaluated them as moderate contributors(Table 3).

Although sanitation was partially included in recovery,the improvement of health facilities was not included.No project or initiative was found that targeted capacity building of the local health institutions to enhance effective and quick response during a disaster emergency.

教师展示校园内银杏树、雪松、红叶石楠、女贞、黄杨等图片,讲述:这些树种的造型都与生长素有关,银杏树和雪松的生长表现出了一种现象,叫顶端优势。然后,将种植在花盆中一段时间的大蒜瓣取出,并展示给学生,提出问题大蒜的根表现出了向地性,而茎表现出了背地性,请用今天分析的课件解释这两种现象。

6.5 Inclusion of Disaster Preparedness and Governance-Related PAVR Measures

The degree of inclusion of PAVR measures related to disaster preparedness was judged to be somewhere between low and moderate(Table 3).Only the initiative to construct cyclone shelters was comprehensively included in recovery efforts.Twelve new cyclone shelters have since been constructed and six more are under construction(Sadik,Nakagawa,Shaw et al.2017).

The ERF had components related to improving disaster governance that included capacity building of GOs and NGOs in disaster management,and policy and guideline formulation for emergency response and NGO coordination(UNDP 2011;UNDP et al.2013).The government prepared a national plan for disaster management(DMBMFDM 2010).But the practice of the plans and policies was limited because the capacity of local government to implement the new initiatives was deficient.Despite establishing a new national level coordination structure,local level coordination suffers from a lack of harmonization,difficulties with coordination among NGOs,and inexperience with proper monitoring(Sadik,Nakagawa,Rahman et al.2017).Therefore experts judged these initiatives as moderate contributors to PAVR.

The early warning system that was designed to protect rivers and seaports of the country(Akhand 2003)has not been changed.Nonetheless the existence of a warning system and its dissemination do not guarantee that people will follow the evacuation order unless the reasons for noncompliance are addressed(Saha and James 2016).By improving the warning system in the recovery phase without addressing the root causes of why people ignored cyclone warnings during the Aila emergency,this indicator was considered excluded as a PAVR contributor.Harmonization is a product of integration,coordination,and alignment(Rahaman and Khan 2010).The integration of different sectoral recovery at a local level—for example,infrastructures,coastal embankments,and livelihoods—is still missing in Aila recovery.The coordination and alignment of humanitarian aid lack an efficient coordination structure at a local level(Sadik,Nakagawa,Rahman et al.2017).Therefore the indicator“harmonization of response and recovery at the local level”was considered excluded from the recovery.

6.6 The Overall Scenario of the Inclusiveness of Aila Recovery

The diagnostic analysis clearly presents the evidence that Aila recovery is a poor vehicle by which to achieve PAVR measures.The spider diagram in Fig.5 illustrates theoverall pattern of inclusiveness of Aila recovery by comparing the degree of inclusiveness of the five indicator categories in improving PAVR.

Fig.5 Inclusion of the PAVR within Aila recovery in Koyra Upazila,Khulna District,Bangladesh

The pattern of inclusion in Fig.5 does not look balanced.It suggests less fruitful results from the recovery and logically indicates that physical environment,WASH and health,local economy,and livelihoods are still in a vulnerable condition similar to the pre-Aila period.The overall result of the diagnostic analysis strongly reveals the shortcomings of the attempt to include vulnerability reduction within the post-Aila recovery programs.Thus the finding implicitly states that the community in Koyra is still living in an underlying vulnerability similar to the pre-Aila period despite the recovery effort.

拟定此研究于2015年1月至2017年12月在我院进行,以规定研究时段内收治的130例老年呼吸衰竭患者为研究对象,随机均分对照组与观察组,各65例。此次研究经医学伦理委员会审核通过,且所有患者家属均知情同意。

7 Concluding Remarks

The Cyclone Aila recovery is a new example of the GONGO joint approach for recovery.Unfortunately,our findings indicate that short-term initiatives,such as temporary housing,small cash grants,cash for work,awareness building,short-term policy formulation,community training,and support for ongoing livelihood activities,were prioritized in the recovery period.Viable measures for eliminating the root causes of the vulnerabilities were not properly addressed.Necessary measures,like hazard-based land-use planning,expanded road networks,improved coastal embankments,technologically advanced agricultural practices,linking of social capital,improved early warning system,coordination and harmonization of NGO efforts at a local level,and increasing capacities of health institutions were completely missing from recovery planning and practice.The results clearly show that the degree of inclusion of viable PAVR measures within Aila recovery was poor.The lack of viable PAVR measures in the recovery results in an ongoing vulnerability.Because cyclones are a frequent,recurrant hazard,the community is still vulnerable,just as it was before Aila.At the time of identifying viable DRR measures,root causes of PAV should be considered carefully.The present situation in Koyra,as well as in other similar areas affected by Cyclone Aila,calls for DRR investment.Such investment has been advocated by the global community as part of a broader concern for development issues(Aitsi-Selmi et al.2016),and it is a priority for Bangladesh at present.

Acknowledgements The first author of this article is the recipient of a Japan Government scholarship(MEXT).This academic research was a part of a collaborative research project(SATREP)between Bangladesh and the Japan Government funded by JST-JICA for whose support the authors wish to express their thanks and appreciation.

Open Access This article is distributed under the terms of the Creative Commons Attribution 4.0 International License(http://creativecommons.org/licenses/by/4.0/),which permits unrestricted use,distribution,and reproduction in any medium,provided you give appropriate credit to the original author(s)and the source,provide a link to the Creative Commons license,and indicate if changes were made.

References

Abdullah,A.N.M,K.K.Zander,B.Myers,N.Stacy,and S.T.Garnett.2016.A short-term decrease in household income inequality in the Sundarbans,Bangladesh,following Cyclone Aila.Natural Hazards 83(2):1103–1123.

Ahmed,B.,I.Kelman,H.Fehr,and M.Saha.2016.Community resilience to cyclone disasters in coastal Bangladesh.Sustainability 8(8):Article 805

Aitsi-Selmi,A.,V.Murray,C.Wannous,C.Dickinson,D.Johnston,A.Kawasaki,A.Stevance,and T.Yeung.2016.Reflections on a science and technology agenda for 21st century disaster risk reduction.International Journal of Disaster Risk Science 7(1):1–29.

Akhand,M.H.2003.Disaster management and cyclone warning system in Bangladesh.In Early warning systems for natural disaster reduction,ed.J.Zschau,and A.N.Kuppers,49–64.Berlin,Heidelberg:Springer Berlin Heidelberg.

Alam,E.,and A.E.Collins.2010.Cyclone disaster vulnerability and response experiences in coastal Bangladesh.Disasters 34(4):931–954.

Ashraf,M.A.,and S.B.Shaha.2016.Achieving community resilience:Case study of Cyclone Aila affected coastal Bangladesh.International Journal of Social Work and Human Services 4(2):33–41.

Awal,M.A.2015.Vulnerability to disaster:Pressure and release model for climate change hazards in Bangladesh.International Journal of Environmental Monitoring and Protection 2(2):15–21.

Chhotray,V.,and R.Few.2012.Post-disaster recovery and ongoing vulnerability:Ten years after the super-cyclone of 1999 in Orissa,India.Global Environmental Change 22(3):695–702.

Contreras,D.2016.Fuzzy boundaries between post-disaster phases:The case of L’Aquila,Italy.International Journal of Disaster Risk Science 7(3):277–292.

Dewan,C.,M.-C.Buisson,and A.Mukherji.2014.The imposition of participation?The case of participatory water management in coastal Bangladesh.Water Alternatives 7(2):342–366.

Dewan,C.,A.Mukherji,and M.C.Buisson.2015.Evolution of water management in coastal Bangladesh:From temporary earthen embankments to depoliticized community-managed polders.Water International 40(3):401–416.

DMB-MFDM(Disaster Management Bureau,Ministry of Food and Disaster Management).2010.National plan for disaster management 2010–2015.Dhaka:Disaster Management Bureau,Disaster Management and Relief Division,Ministry of Food and Disaster Management.https://goo.gl/njSVwM.Accessed 2 Mar 2018.

ECHO(European Civil Protection and Humanitarian Aid Operations).2009.In-depth recovery needs assessment of Cyclone Aila affected areas.Dhaka,Bangladesh.Reliefweb.https://goo.gl/Hkq4Cy.Accessed 2 Mar 2018.

Edquist,C.2011.Design of innovation policy through diagnostic analysis:Identification of systemic problems(or failures).Industrial and Corporate Change 20(6):1725–1753.

EKN and UNDP(The Embassy of the Kingdom of the Netherlands and United Nations Development Programme).2015.Final narrative report of building community resilience through Integrated Water Management(IWM)project in Bangladesh.Dhaka,Bangladesh:The Embassy of the Kingdom of the Netherlands and United Nations Development Programme.https://goo.gl/JjXrkQ.Accessed 2 Mar 2018.

Gain,A.K.,and M.Schwab.2012.An assessment of water governance trends:The case of Bangladesh.Water Policy 14(5):821–840.

Gain,A.K.,V.Mojtahed,C.Biscaro,S.Balbi,and C.Giupponi.2015.An integrated approach of flood risk assessment in the eastern part of Dhaka city.Natural Hazards 79(3):1499–1530.

Gain,A.,M.Mondal,and R.Rahman.2017.From flood control to water management:A journey of Bangladesh towards integrated water resources management.Water 9(1):Article 55.

Giupponi,C.,V.Mojtahed,A.K.Gain,C.Biscaro,and S.Balbi.2015.Integrated risk assessment of water-related disasters.In Hydro-meteorological hazards,risks and disasters,ed.P.Paron,G.D.Baldassarre,and J.F.Shroder Jr,163–200.Amsterdam,Netherlands:Elsevier.

Goodman,L.A.1961.Snowball sampling.The Annals of Mathematical Statistics 32(1):148–170.

Haque,U.,M.Hashizume,K.N.Kolivras,H.J.Overgaard,B.Das,and T.Yamamoto.2012.Reduced death rates from cyclones in Bangladesh:What more needs to be done?Bulletin of the World Health Organization 90(2):150–156.

Hossen,H.2016.Aila damage has not been recovered in sevenBangla25 May 2016.https://goo.gl/88HNwS.Accessed 5 Mar 2018(in Bangla).

IASC(Inter-Agency Standing Committee).2012.Reference module for cluster coordination at country level.https://goo.gl/C7CpdO.Accessed 5 Mar 2018.

IFNet.2009.Report:Cyclone Aila,May 2009—IFNet flood information 2009. http://www.internationalfloodnetwork.org/aila.htm.Accessed 14 Dec 2016.

IFRC(International Federation of Red Cross and Red Crescent Societies).2010.Final report:Bangladesh Cyclone Aila,emergency appeal No.MDRBD004.Dhaka,Bangladesh:International Federation of Red Cross and Red Crescent Societies.http://www.ifrc.org/docs/appeals/09/MDRBD004fr.pdf.Accessed 5 Mar 2018.

Independent,The.2016.Aila victims still suffer.The Independent,25 May 2016.http://www.theindependentbd.com/arcprint/details/44901/2016-05-25.Accessed 5 Mar 2018.

IOM(International Organization for Migration).2010.Joint position paper on:Cyclone Aila:Priorities for action.Dhaka,Bangladesh:International Organization for Migration.http://www.lcgbangladesh.org/derweb/Needs%20Assessment/Reports/Aila_UN_AssessmentFramework_FINAL.pdf.Accessed 5 Mar 2018.

Islam,M.R.,and M.Hasan.2016.Climate-induced human displacement:A case study of Cyclone Aila in the south-west coastal region of Bangladesh.Natural Hazards 81(2):1051–1071.

Islam,R.,and G.Walkerden.2015.How do links between households and NGOs promote disaster resilience and recovery?A case study of linking social networks on the Bangladeshi coast.Natural Hazards 78(3):1707–1727.

Islam,R.,and G.Walkerden.2017.Social networks and challenges in government disaster policies:A case study from Bangladesh.International Journal of Disaster Risk Reduction 22:325–334.

JICA and OCCL(Japan International Cooperation Agency and Oriental Consultants Co.Ltd).2012.Final report:Data collection survey on strengthening of disaster tolerance in cyclone affected area.https://goo.gl/hh5PCR.Accessed 15 Dec 2016.

Koyra Upazila Nirbahi Officer’s Office.2010.At a glance of the Cyclone Aila damage assessment report of Koyra UpazilaUpazila Nirbahi Office,Koyra Upazila(in Bangla).

LGED(Local Government Engineering Department).2016.Webbased database of project monitoring.Bangladesh:Local Government Engineering Department,Ministry of Local Government,Rural Development and Cooperative,the Government of the People Republic of Bangladesh.http://www.lged.gov.bd/ProjectMonitoring.aspx.Accessed 13 Jan 2017.

Mahmud,T.,and M.Prowse.2012.Corruption in cyclone preparedness and relief efforts in coastal Bangladesh:Lessons for climate adaptation?Global Environmental Change 22(4):933–943.

Mallick,B.,B.Ahmed,and J.Vogt.2017.Living with the risks of cyclone disasters in the south-western coastal region of Bangladesh.Environments 4(1):Article 13.

Mallick,B.,K.R.Rahaman,and J.Vogt.2011.Coastal livelihood and physical infrastructure in Bangladesh after Cyclone Aila.Mitigation and Adaptation Strategies for Global Change 16(6):629–648.

Mallick,B.,and J.Vogt.2014.Population displacement after cyclone and its consequences:Empirical evidence from coastal Bangladesh.Natural Hazards 73(2):191–212.

Mallick,F.,and A.Islam.2014.Post-Aila community recovery innovations and planning.In Disaster recovery:Used or missused development opportunity,disaster risk reduction,ed.R.Shaw,241–64.Tokyo:Springer.

Nakagawa,Y.,and R.Shaw.2004.Social capital:A missing link to disaster recovery.International Journal of Mass Emergencies and Disasters 22(1):5–34.

New Age.2016.Seven years of Aila:3,500 affected people still on embankments:Greens.Dhaka,Bangladesh:New Age,Media New Age Ltd.http://archive.newagebd.net/231784/7-years-ofaila/.Accessed 5 Mar 2018.

OECD(Organization for Economic Co-operation and Development).2008.Handbook on constructing composite indicators:Methodology and user guide.Paris:Organization for Economic Cooperation and Development. https://www.oecd.org/std/42495745.pdf.Accessed 5 Mar 2018.

Parvin,G.A.,and R.Shaw.2013.Micro finance institutions and a coastal community’s disaster risk reduction,response,and recovery process:A case study of Hatiya,Bangladesh.Disasters 37(1):165–184.

Paul,B.K.,and S.Dutt.2010.Hazard warnings and responses to evacuation orders:The case of Bangladesh’s Cyclone Sidr.Geographical Review 100(3):336–355.

Rahaman,M.M.,and N.A.Khan.2010.The realities of aid harmonisation and aid effectiveness:Views from Bangladesh.Asia Pacific Journal of Public Administration 32(1):107–122.

Roy,K.,U.Kumar,H.Mehedi,T.Sultana,and D.M.Ershad.2009.Cyclone Aila 25 May 2009 initial assessment report with focus on Khulna District.Khulna,Bangladesh:Unnayan Onneshan,Humanity Watch,Nijera Kori.https://goo.gl/KYime1.Accessed 5 Mar 2018.

Sadik,M.S.,H.Nakagawa,M.R.Rahman,R.Shaw,K.Kawaike,K.Fujita,and S.M.Tariqul Islam.2017.Systematic study of Cyclone Aila recovery efforts in Koyra,Bangladesh highlighting the possible contribution to vulnerability reduction.Journal of Japan Society for Natural Disaster Science 36(Special Issue):107–119.

Sadik,M.S.,H.Nakagawa,R.Shaw,M.R.Rahman,K.Kawaike,and K.Fujita.2017.A study on the humanitarian aid driven Cyclone Aila(2009)recovery in Koyra Upazila of Bangladesh.Annuals of DisasterPreventionResearchInstitute 60B.Disaster Prevention Research Institute,Kyoto University:746–756.https://goo.gl/pqhnPf.Accessed 5 Mar 2018.

Saha,C.K.2015.Dynamics of disaster-induced risk in southwestern coastal Bangladesh:An analysis on tropical Cyclone Aila 2009.Natural Hazards 75(1):727–754.

Saha,S.K.,and H.James.2016.Reasons for non-compliance with cyclone evacuation orders in Bangladesh.International Journal of Disaster Risk Reduction 21:196–204.

Shah Alam Khan,M.2008.Disaster preparedness for sustainable development in Bangladesh.Disaster Prevention and Management:An International Journal 17(5):662–671.

Tada,S.2011.Issues for effective international assistance for post disaster reconstruction:The case of Cyclone Aila in southwestern Bangladesh.Working paper series,Vol.GSIR2011-1.Graduate School of International Relations,Ritsumei University.https://goo.gl/gZYTTF.Accessed 5 Mar 2018.

UNDP(United Nations Development Programme).2010.Cyclone Aila—Joint UN multi-sector assessment and response framework.Dhaka,Bangladesh:United Nations Development Programme.https://goo.gl/CFTQS2.Accessed 5 Mar 2018.

UNDP(United Nations Development Programme).2011.Project document:Early Recovery Facility(ERF).Dhaka,Bangladesh:United Nations Development Program.

UNDP,EKN,AusAid,and SDC(United Nations Development Programme,The Embassy of the Kingdom of the Netherlands,AusAid,and Swiss Agency for Development and Cooperation).2013.Early Recovery Facility(ERF)project annual progress report 2013.Dhaka,Bangladesh:United Nations Development Program.

Walton-Ellery,S.2009.A review of the Cyclone Aila response 2009.Dhaka:IFRC-led Shelter Cluster Coordination Group.https://goo.gl/s8vRqn.Accessed 5 Mar 2018.

Wisner,B.,P.Blaikie,T.Cannon,and I.Davis.2004.At risk:Natural hazards,peoples vulnerability,and disasters,2nd edn.New York:Routledge.

World Bank.2013.Project paper on a proposed additional credit for emergency 2007 cyclone recovery and restoration project additional financing II.Dhaka,Bangladesh:World Bank.https://goo.gl/g4GpNj.Accessed 5 Mar 2018.

Md. Shibly Sadik,Hajime Nakagawa, Rezaur Rahman,Rajib Shaw,Kenji Kawaike,Kumiko Fujita
《International Journal of Disaster Risk Science》2018年第1期文献

服务严谨可靠 7×14小时在线支持 支持宝特邀商家 不满意退款

本站非杂志社官网,上千家国家级期刊、省级期刊、北大核心、南大核心、专业的职称论文发表网站。
职称论文发表、杂志论文发表、期刊征稿、期刊投稿,论文发表指导正规机构。是您首选最可靠,最快速的期刊论文发表网站。
免责声明:本网站部分资源、信息来源于网络,完全免费共享,仅供学习和研究使用,版权和著作权归原作者所有
如有不愿意被转载的情况,请通知我们删除已转载的信息 粤ICP备2023046998号