2018-05-01 Study on evaporation characteristics of brine in spray evaporation process at ambient temperature

ZHAO Baohua1, GAO Ran2, WEN Jiaqi2, YI Zuyao1, HAN Zhengfei1(1.Huadian Zhengzhou Designing and Research Institute, Zhengzhou 450046, China; 2.College of Environmental Science and Engineering, North China Electric Power University, Baoding 071003, China)

Abstract:China encourages “nearly zero discharge” of industrial wastewater, and advanced treatment of brine is of great deep concern. Desulfurization wastewater, mining wastewater and other industrial wastewater can be processed by spray evaporation technologyat ambient temperature. On the self-built outdoor test beds for spray evaporation test, the evaporation rate of brine was measured and the characteristics of evaporation products were described by scanning electron microscope (SEM). Smaller atomized particulars lead to a larger evaporation rate. When the particle diameter is over 500 μm, decreasing the size of particular has small effect on evaporation rate. Smaller salinity leads to a larger evaporation rate, but the difference is slight. The spray evaporation rate has an approximately linear positive correlation with the wind velocity, exponential positive correlation with temperature, and a negative correlation with the relative humidity. The wind velocity is the decisive factor of the spray evaporation rate as wind velocity is large. When the relative humidity is over 90%, humidity is the decisive factor. When the temperature is less than 15 ℃, the temperature is the main factor . The mechanical atomization rate of the test is about 4~12 times of natural evaporation rate.At the same time, it is noted that there is wind loss in spray evaporation rate, and measures should be taken to avoid the secondary pollution caused by water of high salinity.

Keywords:spray evaporation;mechanical atomization; desulfurization wastewater; brine; desalination; nearly zero discharge; evaporation rate

2018-05-08 Analysis and improvement on logic design of G60 generator protection

线索提示:故宫太和殿和天安门城楼都有两层屋檐,和前文图片长得不一样,猜不出来怎么办?两层或多层屋檐在中国古建筑中叫“重檐”,其作用是提升屋顶的高度和层次,让建筑更为雄伟庄严。不要被重檐“误导”,看看每一层屋顶有什么特征,答案或许就出来了!

LIU FangWANG Dongya(Zhuhai Jinwan Power Company Limited, Zhuhai 519000, China)

Abstract:There are many protection changes on GE generators since #3 and #4 units of Zhuhai Jinwan Power Company Limited got into operation in 2007. G60 protection on generators includes 500 kV switches full stop protection, CT disconnection, loss of excitation protection and wave recording startup. The problems of secondary circuit wiring and logic design are analyzed and improved to optimize the protection function of generator, which guarantees safe production.

Keywords:generator; generator-transformer unit; protection logic; switches full stop protection; loss of excitation protection; wave recording startup; secondary circuit

2018-05-13 ACC design optimization for gas turbine combined cycle units

1.实验动物及分组:C57BL/6 雄性小鼠,6~8周龄,体重为18~22 g,由安徽省实验动物中心提供。实验前适应性饲养1周,造模前12 h禁食,不禁水。将30只小鼠分成对照组、AP组、消退素D1组,每组10只。参照文献[2]方法,以腹腔注射雨蛙肽50 μg/kg体重7次、每次间隔1 h建立小鼠AP模型。消退素D1组小鼠在造模前1 h及造模后4 h腹腔注射消退素D1 50μg/kg体重,对照组腹腔内注射等容积生理盐水。雨蛙肽购于美国Sigma公司,消退素D1购自美国Cayman公司。造模结束后处死所有小鼠,处死前称小鼠体重,处死后取血,分离血清保存,取胰腺、肺组织。

QIU Yonggang(Shanghai Electric Power Generation Engineering Corporation, Shanghai 201612, China)

城里,我遇到老K,讲了这件事。老K不屑地说,没脸了呗,弄了个家破人亡,妻离子散,自己倒成了一个屯子人了。自作自受!

Abstract:According to the basic principles of heat transferring,it creates a mathematical model of heat transferring area and power consumption of ACC affected by initial temperature difference (ITD) and head wind velocity. Taking an F-class one-plus-one CCPP as an example, it calculates the influence of ITD and head wind velocity on net output and ACC heat transferring area of power plant and obtains the optimized ACC design parameters.

Keywords:direct air cooling condenser; heat transfer coefficient; head wind velocity; ITD; heat transferring area; net output; power consumption of ACC

2018-05-17 Research on status and application prospect of locally installed protection of intelligent substation

LI Liangyu, TANG Baofeng, ZHAO Xianlong, ZHANG Ji, ZHENG Ziyao(State Grid Hebei Economic Research Institute, Shijiazhuang 050021, China)

Abstract:On the basis of the status quo of the locally installed protection,the scheme of locally installed protection is proposed.The characteristics of single-master scheme and full-master scheme are compared for cross-interval protection. It focuses on single-master scheme of transformer protection and the full-master scheme of busbar protection.The key technical issues of locally installed protection are pointed out.Current progress of research and development of localized protection devices is summarized and the application scenarios for locally installed protection is prospected.

Keywords:intelligent substation;locally installed protection;cross-interval protection;single-master scheme;full-master scheme;key technologies

2018-05-21 Research on risk assessment and information management of boiler heating surfaces

ZHAO Xiaopeng1, ZHAO Fei2, NI Yongzhong2(1.Ningxia Jingneng Ningdong Electric Power Company Limited, Yinchuan 750400,China; 2.North China Electric Power University, Beijing 102206,China)

Abstract:The main reason for unplanned outage is the bursting and leakage of heating surfaces of power plant boiler. According to the status quo of passive inspection and maintenance on power plant anti-wear and explosion proof, a concept of digital management on boiler anti-explosion and anti-explosion work is put forward. Wall temperature of boilers are analyzed, assessed and graded from various aspects. The risk assessment model of heating-surface pipe is established. The equivalent creep lifetime loss caused by over-temperature is introduced into the evaluation model. Combined with off-line testing data, the risk level of the heating-surface tube is amended dynamically, which can improve the assessment reliability of the risk indicators.

HAN Qin, FAN Huijian, LIU Zhanli(Huadian Electric Power Research Institute, Hangzhou 310030, China)

2018-05-25 Multivariable modeling of the main steam temperature based on field data and PCA

HOU Xiaoning(Huadian Zhengzhou Mechanical Design Institute Limited Company,Zhengzhou 450046,China)

Abstract:As the main steam temperature system is a multivari-able and strong coupling system, a large number of field operational data is collected. Through principal component analysis(PCA),five main variables are extracted from 11 procedure variables as the input of the main steam temperature system. Simultaneously, the mechanism modeling, experimental modeling and intelligent optimization algorithms modeling are combined. Finally, the multiple-input single-output multivariable model is established by using the field data. This solution solves the problem of frequent and large-scale step disturbance tests in which it is not allowed or cannot to get to the productive site. It overcomes the uncertainty of the range of initial values and model structure for multivariable intelligent optimizing, and established a multivariable model that can be used for studying main steam temperature system control.

寻找一处抢眼的焦点,例如一棵与众不同的树木,或是一处艳丽的色彩。树根是非常好的视觉引导线。使用广角镜头,从低处由下而上拍摄树冠,突出极具戏剧艺术感的树木图案。

Keywords:main steam temperature; multivariable modeling; principal component analysis; field data

2018-05-30 Magnanimous DTU information acquisition C/S model based on epoll mechanism in Linux

BU Zhengrong1, CHENG Yongming2, AN Fuli2, LIU Bin2(1.Mawan Power Plant of Shenzhen Energy Group Company Limited, Shenzhen 518054, China; 2.Xi’an Thermal Power Research Institute Company Limited, Xi’an 710054, China)

FU Xueliang, LI Dejun(Nanjing SAC Power Grid Automation Company Limited,Nanjing 210000, China)

Abstract:With the rapid development of distribution automation in our country, the traditional distribution collection model cannot meet the demand of large-scale real-time massive power distribution terminal. Power distribution network data acquisition has become a key technique of large-scale distribution master station. Analyzing the characteristics of Linux epoll mechanism, we design a magnanimous networking communicating information processing model which combines multithreaded synchronization and data access mechanism. It studies the model design and the implementation of epoll mechanism under C/S model.It guarantees the timeliness and safety of distribution information whenthere is large scale of clients and service terminal type distribution terminal.

Keywords:Linux;epoll;multithreaded synchronization;DTU; information acquisition;C/S model

2018-05-33 Control strategy on steam temperature of 1 000 MW double reheat units

HU ZunminYU GuoqiangSHU JianjunZHANG Tianhai(Jiangsu Fangtian Power Technology Company Limited, Nanjing 211102, China)

Abstract:Taking 1 000 MW double reheat units of Guodian Taizhou Power Generator Company Limited, it introduce the control principle of superheated steam, first and second reheat steam temperature for tower type double reheat boiler. Analyzing steam temperature’s control logic on proportion, integral and derivative (PID), it proposes a control logic for steam temperature regulating equipment of 1 000 MW double reheat units which can provides reference for unit control logic configuration and optimization of double reheat units.

Keywords:tower type boiler; double reheat units; steam temperature; control logic

2018-05-38 Refinement and analysis on alarm information system during the gas turbine SFC start-up

GU Yiyang1XIAO Liming2(1.Jiangsu Huadian Qishuyan Electric Power Company Limited, Changzhou 213011,China; 2.School of Electronic Information Engineering, Nanjing University of Information Science and Technology, Nanjing 210044,China)

Abstract:Gas turbine generally adopts the static frequency converter (SFC) as startup mode of electric drive. The SFC system has a complex logic system, and its faults affects the start-up and operation of the whole unit. Mastering the principle of SFC system and improving alarm information system can speed up the problem solving of electric driving, save the time for the paralleling to the grid, and ensure the normal start of the unit. Through practical tests and exploration a solution optimization scheme is put forward to solve the general problems in SFC operation.

1.3 统计学分析 采用SPSS 19.0统计软件进行统计学分析,分为计量资料与计数资料两类,计量资料以及百分比(%)表示,进行t检验分析,重复测量的计量资料进行方差分析,计数资料进行χ2检验分析,Logistic分析处理上述检测指标与儿童多动症的关系,P<0.05表示差异有统计学意义。

Keywords:gas turbine; static frequency converter (SFC); start-up; electric drive; alarm information

2018-05-41 Analysis and regulation on vibration of high temperature and high pressure pipe

从图8和图9可以看出,在低速区和中、高速区,采用交互双模自适应无迹卡尔曼滤波算法时ω的精度明显提高,其估计曲线几乎与实际曲线重合。从图10和图11可以得知所采用的算法能够有效辨识出变速模型M2和变速因子ζ,表明交互双模自适应无迹卡尔曼滤波算法能够良好地跟踪永磁转子变速运动状态。

Abstract:In order to solve the problem of excessive vibration at hot reheat steam pipe, field investigation, vibration measurement and data processing on pipe vibration are carried out to analyze the vibration characteristics of the pipeline. It points out that regulation on vibration should be made from three dimensions which are eliminating the turbulence force, improve the piping vibration characteristics, and maintain the level of primary stress and secondary stress level as far as possible. It puts forward a scheme to install vibration damping device on the premise of ensuring qualified stress of pipe system. The pipeline vibration is effectively controlled after treatment.

两组患者功能指标见表2。LCP组开始部分负重活动早于SEF组,差异有统计学意义(P<0.05),末次随访时,LCP组膝、踝关节活动范围平均值优于SEF组,差异均有统计学意义(P<0.05)。

2018-05-45 Analysis on power reliability of 600 MW and above coal-fired units

Keywords:anti-explosion and explosion proof; over-temperature; 3D visualization; risk assessment

Abstract:To improve operational reliability of 600 MW and above coal-fired units ,it analyzed the factors affecting the reliability of 600 MW and above coal-fired units of 2016. It is concluded that the poor quality of maintenance, poor quality of products and fuel affection are the main reasons for the unplanned outage of the units, among which the poor quality of maintenance is the dominant reason. Unplanned outages caused by boilers accounted for the largest proportion of unplanned outages caused by the three main equipment. Blockage, steam leakage, oil leakage, water leakage, great vibration, jam, abrasion, high temperature, corrosion, cracks and so on, are the main factors affecting the reliability of auxiliary equipment.

Keywords:600 MW and above coal-fired units; power reliability; unplanned outage; boiler; auxiliary equipment

2018-05-50 An improved phrase selection device of double circuit lines on the same tower

ZENG Xianhua(Guodian Nanjing Automation Company Limited, Nanjing 210003, China)

Abstract:Analyzing the faulty features of the double circuit lines on the same tower and the existing conventional mutation of phase selection device that accrues in cross-line fault, a new method is proposed to deal with phrase selection based on mutant phase selection of double circuit lines. After the fault of system, phase selection device should adjust the proportional relation between the offset voltage and the voltage mutation according to the magnitude of the fault current, recognize the simple fault in internal area and complex fault in external area, input phase selection device adaptively. In view of cross-line fault of double circuit lines, a new phrase selection method is put forward, which effectively solve the mistaken choice of mutation phrase selection device while dealing with the cross-line fault, improve the security of the power system operation, stability and reliability of the transmission.

Keywords:double circuit lines on the same tower; phase selection element; cross-line fault; mutations

2018-05-53 Anti-freezing key points of direct air cooling unit in winter operation

首先,升学考试对英语习得有一定的负面反拨效应。由于中考、高考的英语科目主要考察句型、语法规则、单词等固化知识点,语言创造性应用的分值比例不大,所以,中小学阶段的基础英语学习重心主要集中于机械式记忆(胡钰衎,2016),缺乏个性化和乐趣,较难激发学生的学习兴趣和主观能动性。

REN Liang(Huadian Xinjiang Power Generation Company Limited, Changji Thermal Power Station,Changji 831100, China)

Abstract:The anti-freezing method of 330 MW direct air cooling co-generation unit operating in winter, especially in the extreme cold weather, is still in experience accumulation and exploration period. According to the existing operation mode, continuous optimization and adjustments,such as raising the back pressure of units, starting the standby vacuum pump and exit isolation column, are made to meet the winter anti-freezing requirements and overcome the code winter.

Keywords:direct air cooling; operation and adjustment; anti-freezing

2018-05-56 Cause analysis and treatment of high moisture content of gypsum in 1 050 MW unit

洱海流域纯林碳密度39.52 t·hm-2,栎类碳密度最大。各优势树种(组)平均碳密度由大到小的顺序为:栎类>华山松>云南松>桉类>冷杉>其他阔叶树>柏木。

Keywords:generator; carbon brush; brush cord; peeling off; embedding process

Abstract:Aiming at the problem of high moisture content of gypsum in a 1 050 MW unit, the influence factors such as the quality of limestone powder, the quality of the absorber, the vacuum pump, the vacuum degree of vacuum belt dewatering machine and the solid amount in underflow of the swirl are investigated. The main reason to determine the high water content of gypsum is the low installation precision of vacuum belt dewatering machine, and the cracks in gypsum results in the reduction of vacuum degree. The secondary reason is that the pH of the absorber slurry is high and the gypsum crystal is rare. By taking corresponding measures, the high water content of gypsum is solved.

Keywords:gypsum; moisture content; vacuum belt dewatering machine; vacuum degree; crack

2018-05-58 Optimized design of automatic generation control system at plant level

DAI Xihui(Guangdong Honghaiwan Generation Company Limited, Shantou 516623, China)

Abstract:In order to achieve the economic distribution of load among different units in plant, Guangdong Honghaiwan Generation Company Limited launch a set of external plant level automatic generation control (AGC) system. AGC command turns from the original load command for single unit to load command for the whole plant. After acceptance of load command for the whole plant, load optimization calculation is made by plant level AGC server. It introduces the construction of plant level AGC system, structure and process of software at plant level, and summarizes the key designing points of AGC system. After the operation of the system, accuracy of every channel, the load command distribution, load change rate and response to primary frequency modulation can satisfy the requirements of grid. The load distribution right of each unit is obtained by the plant side.

Keywords:plant level automatic generation control system; optimization; load distribution

2018-05-61 Causal analysis on the carbon brush cord peeling off from the 390H generator excitation

NIU Zhifeng(Jiangsu Huadian Qishuyan Power Generation Company Limited, Changzhou 213011, China)

Abstract:It introduces the structural characteristics of 390H generator excitation carbon brush. Comparing and analyzing the original parts and replaced parts from structures and craftsmanship, it points out that ordinary carbon brush cord embedding process is not applicable to this type of carbon brush, which is the main cause of carbon brush cord peeling. It can be taken as reference for selecting carbon brush and operational maintenance for generator excitation.

CHEN Li1WU Chunchao2(1.China Energy North China Electric Power Test and Research Institute Company Limited, Tianjin 300162, China; 2.Xinjiang Production and Construction Corps Hongxing Power Generation Company Limited, Hami 839000, China)

1.4 统计学方法 所有的资料均统一编码,用SPSS 13.0建立数据库,根据资料性质分别进行统计学描述、t检验、χ2检验和多因素回归分析。

2018-05-63 The method of energy conservation and environmental protection by generating Electricity with falling water of cooling tower

YU Dechao1, WU Weiyu2(1.China Huadian Yongzhou Wind Power Company Limited, Changsha 410004, China; 2.Hunan Electric Power Design Institute Corporation Limited of China Energy Engineering Group, Changsha 410007, China)

Keywords:pipe; vibration; vibration characteristics; vibration damping device

从2017年度艺术民族志个案研究的综合分析来看,研究者能够主动地使用人类学的理论来阐释民族民间艺术,田野研究的质量也有了不同程度的提升。虽然这些研究者多为具有艺术学学科背景的学者,但是敢于打破固有的“就艺术而论艺术”的研究范式,并且能够在深入的田野调查基础上呈现出有独到见解的艺术民族志,是值得肯定的。主要关注的问题集中于艺术形态、艺术功能、文化变迁、文化生态、审美认同、文化身份、艺术家与传承人等方面。

Abstract:It introduces a reconstruction scheme of cooling tower in thermal power station. It adopts and combines the existing materials and devices to utilize the energy of falling water of cooling tower. It solves the environmental problem of noise, prevents the anti-crosswind and reuses cooling water, which increases the efficiency of the device and the cooling effect of cooling towers.

2018-05-68 Analysis and countermeasure of main factors affecting comprehensive water consumption rate of Silin Power Plant

Keywords:cooling tower; reconstruction; noise reduction; crosswind; energy recovery; efficiency; environmental protection; wind deflector.

综上所述,在维持性血液透析治疗中开展心理护理干预,有助于患者负性情绪的缓解和消除,在改善预后和确保治疗的顺利进行方面存在积极的影响。

HOU Guangqiang(Silin Power Plant,Guizhou Wujiang Hydropower Development Company Limited, Sinan 565109,China)

Abstract:The water consumption rate of Silin Power Plant,Guizhou Wujiang Hydropower Development Company Limited is relatively high. The external environment of unit operation is analyzed from the function of power plant in power grid, reservoir operation characteristics and relationship between upstream and downstream reservoirs. The main factors affecting water consumption rate are analyzed from the internal environment which includes adjustment of time between overhauls, load fluctuation per unit and single unit operating condition. It takes measures such as the dynamic control of reservoir water level, the improvement on the accuracy of small flood forecast and the optimizing the starting sequence of units, to effectively reduce the water consumption rate of power plants.

Keywords:Silin Power Plant; comprehensive water consumption rate; external environment; internal environment

2018-05-70 Design and application of water level measurement system for boiler drum of waste heat boiler in distributed energy station

DONG Shumei1, YU Li1, DU Juhu2(1.China Huadian Engineering Company Limited, Beijing 100070,China; 2.Huadian Distributed Energy Company Limited,Beijing 100070,China)

Abstract:The reliability of water level measurement signalof waste heat boiler drumin regional distributed energy station is directly related to the safe operation of waste heat boiler and steam turbine equipment .Therefore,the water level measurement system of waste heat boiler drum is one of the most important system for thermal measurement. Taking the water level measurement to a high-pressure drum of double pressure waste heat boiler as an example, the key designing points of water level measurement system are analyzed and studiedfrom configuration of measuring instrument for water level of drum, drum instrument measuring principle, the configuration and the corresponding correction method for balance container of differential pressure type level gauge, the drum water level control and processing of protective signal.

可以说,吕柟受学于晋人,发挥晋学,又反哺于晋学,致仕后又将晋学带回关中,成中继张载之后“关学”的领军人物,都对当时及后世的学术起到了重要作用。

Keywords:water level of boiler drum;configuration of measuring instrument; configuration of balance container;adjustment of protective signal

2018-05-73 Brief analysis on the development and design of building gas distributed energy supply system

YU Li1, 2(1.China Huadian Engineering Company Limited, Beijing 100070,China; 2.Huadian Distributed Energy Company Limited, Beijing 100070,China)

Abstract:Natural gas distributed energy has developed rapidly in China in recent years. It analyzes the factors that influence the economic efficiency of building gas distributed energy supply system and puts forward the suitable development conditions. At the same time, the key designing points of building gas distributed energy supply system, the requirements for energy station location and layout are put forward.

Keywords:building gas distributed energy; natural gas prices; time for heating and cooling; condition and scale

2018-05-75 Analysis of high voltage fault of super capacitor in wind turbine pitch system

LI Yanan(State Grid Shanxi Changzhi Power Supply Company, Changzhi 046011,China)

Abstract:Analyzing pitch capacitor’s high voltage fault in Vensys pitch system of a wind farm in Inner Mongolia. Analyzing the cause of fault and check them item by item, it is found out that while taking manual pitch control, the output voltage of pitch capacitor voltage monitoring module is less than 54 V after 3 s .The voltage return to normal after terminating the pitch system . After replacing the supercapacitor, the unit return to normal operation.

Keywords:wind power unit; pitch system; supercapacitor; voltage

 
《华电技术》 2018年第05期
《华电技术》2018年第05期文献

服务严谨可靠 7×14小时在线支持 支持宝特邀商家 不满意退款

本站非杂志社官网,上千家国家级期刊、省级期刊、北大核心、南大核心、专业的职称论文发表网站。
职称论文发表、杂志论文发表、期刊征稿、期刊投稿,论文发表指导正规机构。是您首选最可靠,最快速的期刊论文发表网站。
免责声明:本网站部分资源、信息来源于网络,完全免费共享,仅供学习和研究使用,版权和著作权归原作者所有
如有不愿意被转载的情况,请通知我们删除已转载的信息 粤ICP备2023046998号